Answer Posted / meher deep
agartala
Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is The Resistance Formula
How we can defined theecopper cable size if we know the aluminium cable size?
How to reduce the static electricity producing in solvent room? By P.D.Patil BioCon
How to resolve if Diesel generator stop while running ?
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
what is the defination of Cable database? What are the points are considered while preparing cable database? Is there any sample available for cable database?
If a rotary UPS is in line through grid power; What would be the impact on Power Factor if the load through rotary ups is 25% , 50% , 75% & 100%. Will the power factor reduce with less load?
How to calculate fault level of 11 KV system
Installation resistance for whole installation of 16 kva & 25 KVA DTRA a) Between each conductor b) between conductor to earth c) installation resistance for each apparatus, each conductor to earth d) earth resistance for the system of earthing
List out the different frequency domain specifications?
How to calculate the size of earth cable to earth the neutral of UPS ?
why are u join ntpc
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
write a c++ code that receives an integer number and display the sum of the number and its revers integer?
Hi Friend I am used multimeter to measure the voltage between R Phase(SS1) to R Phase(SS2). In SS1 is connected with UPS loads. But I am getting voltage between these 2 R Phases. Please give some idea friend