Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Wht ar the reason for low voltage on consumer side?

Answer Posted / mani

The low voltage mostly in the peak hours why because that
time more number of consumers are using the power.So the
voltage will get reduced on the distribution line.

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

could anybody able 2 send me jindal steels previous papers fr electrical steam....pls send 2 my id if possible....sirisha.shaik@gmail.com

2090


WHAT IS MEANT BY TV TERMINAL IN 500MVA TRANSFORMER?

2289


relation between power station capacity and voltage level?

2059


What is installed in PAC that is control the humidity

1516


Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics

2312


What is polar plot?

1178


Define newton's law of viscosity.

1214


what is earth pit , how we can measured it, what earth rods reference

2616


HOW TO SET THE EARTH FAULT SETTINGS IN ACB????????????

2171


how to calculate the step resistance for slipring induction motor,how you deside the no of step for that?

2240


send me all basic electrical question and answers

2920


What are the specifications for getting approval of Substation?

1932


In motors how many types of cooling systems were used?

2073


why the name trunking bus PT

3068


Has someone here done a sizing for a generator (3 phase), its for a pumping station. If you have an example for standby/duty and both running (I) star delta (ii) Soft Starter.

2141