1>Hai everyone,please anyone explain me the different
sections and there function with paths and overall flow how
to use the
test directory.
2>test plan is included in TD or not
Answer Posted / swati
-Requirements: we can specify requirements here
-Test Plan: all the test scripts can be kept here.. one to
all
-Test Lab: here we can make scenarios including various
test scripts.
-Defectes: here we can log defects as we find.
we can link the requirements with test scripts
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is EXPORT AND IMPORT in Quality Center (pl. Explain with easy steps to understand.)
how can we see all fields in test director
I installed TestDirector 7.6 on my PC which has windows media center edition. It was working fine in the begining. But now when I try to start it, I get the message, "cannot connect to databas. The data base version is older than 7.5, please update database". I am using MS Access as the database. Any help would be appreciated.
How do we attach excel sheet with test director?
Explain about failure options in TD
What is the difference between master test plan and test plan?
How to add test id to testplan?
How can we export multiple test cases from td in a single go?
how do u call data file and gui file in testdirector
How many versions are there in Test Director.
Of course, Test Director has recapped as Quality Center. What is the main difference between 8.2 version and 9.2 version of Quality Center?
What databases can test director reside on?
What is Business Process?
what are the type of testing and methodologies
What is Test Director's API execution tool(VAPI)?