I have a 600VA UPS for computer only. It holds for
20minutes only.
1. Can it be upgraded for longer period.?
2. Can it be used for one ceiling fan and a tube light? If
yes, how to upgrade?
Answer Posted / rpg
yes u can upgrade it by upgrading battery of higher Amp Hour
Capacity in UPS.
Is This Answer Correct ? | 32 Yes | 17 No |
Post New Answer View All Answers
I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?
How to determine the breaking capacity such as break down current and break down voltage for VCB and CT's.
What is electrical cable termination
I completed iti in2004 I was worked in A grade contractor can I get c licence
whatis the commertial spec. of distribution boards ?
i have to install a HT panel, what components, I have to use in this and what will the diagram of that diagram,please tell me each and everything.
Define super node?
what is current check gurd relay?
What is a advantage of Self Reset Lockout ? On Fault breaker get trip & fault no longer exist then self reset lockout how inform us?
why we need to us lenz's law for synchornous motor
What is cathode ray oscilloscope (cro)?
Why using synchronising methed in DG's sets?
what may the reason for vector shift in a generator?
In Dyn11 power transformer if any one of the 3 phases connected to earth in star connected side then please explain effect of the current flow in delta connected side of transformer.(In this case if one phase is shorted to ground in star connected side then we observe the current flow in two phases only not three phases in delta connected primary side. Please explain why it is so?)
specific difference of ICT&Auto Transformer