Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what will happen if the secondary of current transformer
kept open....

Answer Posted / max

dude as CT will step down current value it will step up the
voltage hence on the sec side resulting in very high voltage...

Is This Answer Correct ?    25 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what do you mean by type zero control sytem ?Give an practical example of type zero contol sytem?

1976


at what base you will tell the direction of rotation of dc motors and generators?

1140


Distinguish between nuclear power station with thermal power station for initial cost, starting period, cleanliness, and transportation of fuel

2028


In what condition the HT fuse breakes?

2023


What is tan delta & PPM in transformer? and whats its IS value?

2163


hi if anybody got model questions for cpcl Grade'A' electrical engineer position.send it to my mail please krishkumar22@gmail.com

2016


In both 600/1000 V cable and 450/750 V cable, we can supply 415 V. However for distribution, all utilities are using only 600/100 V instead of 450/750 V. What is the reason?

1969


What are the types of control system?

1431


how to wiring it with contactor and timer together

1863


how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you

2005


if we look on phasor of the transformer vaoltage is 180 oppsite at primary and the secondary so to improve a power factor is secondary should kept negative to improve it primary side means is -.90 became +.90 at other side

1862


A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?

5291


I want to know Electrical Circuit?

2170


what is the isolation transformer. what is the isolator?

2073


IN electrical field, WHAT ALL THINGS THE CUSTOMER WILL ASK WHILE ORDERING FOR LT PANEL (ALL TYPES OF LOW TENSION PANEL)

2123