Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Clearly Define Active,Reactive,Apparant power.Which
applications used which power above metioned power?

Answer Posted / venkat iyer

Apparent power - The power made available to us by
electricity authority for which we pay tariff.
Active power - The power that the connected load consumes
Reactive power - A nuisance power generated by the
connected load in the system itself.
All the three are vector components. Therefore in a common
man's language, active power is nothing but apparent power
delivered at a factor known as 'Power Factor'

Is This Answer Correct ?    23 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is PID control in VFD drives?

1927


What is the formula for selecting the cabels according to load? How to calculate what sq.mm cabel to be used?

1429


i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400

2059


Why are iron cores in transformers made laminated?

1047


Why 15Amp. MCB is suitable to carry load of 1.5Ton Ac please Explain?

2117


What is meant by Im=30mA@Vk/2. How to know the kee point voltage for CT design

3382


why swinburnes test cannot be performed on series machines?explain

2295


If we have use two power cable for incomer, that time how many use cbct for earth leakage protection? 1 or 2 if 1 way? If 2 way?

2059


what is the relationship between phase & neutral

2535


How to identify the start and end of 3phase 12 lead motor if U1, U2, etc numberings are lost or erased.

2091


1. A bomber drops a bomb from an aircraft flying at 2000 km/hr. at an altitude of 7km. The speed at which the bomb will strike the earth would be

1851


what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)

2648


what are the applications of transistors with low dc gain, high dc gain and medium dc gain( beta)?

1708


What is the bundle conductor?

1140


WHAT IS THE TOTAL POWER GENERATION IN CHHATTISGARH?

1898