How to increse bearing capacity in soils (Stabilisation of
soils)

Answer Posted / m.bindu

using geotextiles at different levels
mechanical,chemical stabilisation meyhods
maintenance of OMC and MDD for the particular soil.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the percentage of silt in black cotton soil.?

1941


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1510


Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance

2142


how much tempareture are required to make liquid state of pid leed

1694


What are the advantages of cad software’s?

667






how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2098


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2041


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1569


What type of tensile strength is handling by crank in beam? Thanks.

2033


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

1752


What is Refuse Area In High Rise Building ?

1482


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1192


Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.

1604


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

1940


how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

1597