Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to increse bearing capacity in soils (Stabilisation of
soils)

Answer Posted / m.bindu

using geotextiles at different levels
mechanical,chemical stabilisation meyhods
maintenance of OMC and MDD for the particular soil.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

which software is better for design and analysis of buildings (stadd pro ) or (Etabs)

2291


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

2078


what is the list of building construction equipment & teir output?

2072


how to calculate the concrete mix m30 by volume

1538


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

2535


types of laps in column

2361


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

2495


I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.

2257


How to calculate 1 brss for RCC work  

2178


How to construct a water sump in a rocky soil?

2207


a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.

2353


How is make concrete cube?

1197


The 4 main factors to start a construction project are––

2264


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9508


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

1856