Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the different lines and what are the different
types of losses occur on them?

Answer Posted / manish meena

1)short transmission line: when the length of an overhead
tranmission line is about 50 km and line voltage is <20kv
2) medium transmission line: when the length of an overhead
transmission line is about 50-150 km and line voltage is
>20kv<100kv.
3) long transmission line: when the length of an overhead
transmission line is about more than(>150km) and line
voltage is >100kv.
Main losses are corona losses,losses due to inductance and
capacitance(but these are negligible)



Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain how you decide what size of electrical wire do you need?

1063


what is the current density of copper & alluminium.

1991


can i use the six sigma method which is used in management area, in state estimation of power systems?

1802


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1900


hi I have done 3 yrs diploma in electrical engg after 10+2. I have 16 years of work experience into design proposals sales and engg application development in LV/MV swithcgear and sub station automation field. I want to apply for immigration to new zealand but I am not sure whether I qualify or not since I dont have a degree. Can anyone advice? Thanks Riz

2207


why should small green grass ans small plant should not be there inside the transformer Yard in the factories

1662


what is ps impedance test

2063


What is contract demand in solar system?

1646


Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,

1776


hi friends ,iam working as genset AVR service engineer in electrical field from past 2 yrs throughout india . i plan to shift in some other job without travelling in same field because i con't travel,i dont know what i do for that so please guide me what job is suited for me,how i can serch the job please anybody helpme iam totally confused

1969


what is quality factor in series resonance circuit and calculate the factor of voltage magnification? how it happens?

1906


define hysteresis loss, eddy current loss and windage loss

1923


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2767


What is self exciting?

1639


What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?

1900