why there is need to provide shear reinforcement?give the
basic reason?
Answer Posted / amar
to avoid the shear failure at the edge of the joint or at
any point load. Shear form due to load which will cause the
failure of structure in a vertical plane thats why
stirrups ,bent up bar,
| Is This Answer Correct ? | 9 Yes | 6 No |
Post New Answer View All Answers
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what is the procedure of wet seiving. n percentage of silt in different type of soil?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
How do you change a dimension value in solidsworks?
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?
how many minimum admixtures are used in water froofing structures
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
difference between trapezoidal and pedestal footing and how the load acts on that
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
what is constat for brickwork