Answer Posted / manoj
to be a better professional......to know this industry, i m
entering, more closely.......
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What are the causes if one cylinder in a diesel engine has a high temperature?
What are the causes of low compression in the main engine?
What is brain of the computer?
about basic questions ofpiping engg
What are the advantages of powder metallurgy?
Company insists on a joining bond to protect the investment made in recruiting, training and mentoring employees. Are you willing to make this commitment ? -1 year for candidates > 5 years experience -2 years for candidates with 2-5 years experience -3 years for candidates with 0-2 years experience
What is the law of thermodynamics?
What is mechanism?
What is the maximum P-max for a cylinder in M/E.
If a dimension is given as SC parameter, is supplier allowed to use full range of tolerance specified in drawing without proving capability?
What is the boiler bank position?
What is a turboprop engine?
Explain how does a super charger work in a car?
which tests are performed in central air conditioning
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb