Answer Posted / selva mani
the structure which is above the ground level is called
super structure...
| Is This Answer Correct ? | 6 Yes | 6 No |
Post New Answer View All Answers
what is the design procedure for building
please briefly explain calculating or estimating steel quantity for a RCC column?
What do we mean by partial moment release ??
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Which prize is the alternative to the NOVEL Prize?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
What is the tallest man made structure in the world?
Write short note on construction programme for pile foundation.
What is Joule Brayton Cycle?
residential buildings,mixing of concrete,structural,construction material,site handling.
What is Refuse Area In High Rise Building ?
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.