Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

where we provide hinged joint in a framee structure ?

Answer Posted / ankitkumar

If Free moment is to be allowed and fixity is not in
concern then hinged joint is provided.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why we use aggregate,sand with cement in concrete?

9792


How can i display 5 asterisk and another 5 asterisk )?

2497


04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1

2032


How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy

2022


how to calculate steel for slab or footings?

1633


foundation details for 25 ton weight Furnace on 2 supports and 2 tilters

1544


will fix foundation bolts at site with out template is there any procedure?

2621


In a concrete grade C35A, C & A stands for what and equalent cube strength?

3651


what is pouring and explain

2340


How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument

2148


How do we calculate absolute pressure?

1338


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2129


While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?

1156


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2099


how to identify the failure of building by expansive soils

1642