ORA-16775: Target standby in switchover operation has
missing redo logs.
Answer / guest
Cause: The target standby database in a switchover operation
did not have all the redo logs from the primary database.
The switchover cannot continue in this case.
Action: Query SendQEntries to see what are the missing logs.
Make sure log transport service is functioning correctly. Do
some log switches on the primary and wait for the gap
fetching mechanism to re-ship all the missing redo logs.
Issue the switchover command again when there is no missing
redo logs on the target standby database.
Please add more information about this Error
Is This Answer Correct ? | 0 Yes | 0 No |
ORA-19619: cannot call restoreValidate after files have been named
IMP-00093: Inconsistency between dumpfile constraint definition for table string with columns (string)
ORA-06773: TLI Driver: error reading command
ORA-07506: scgrl: $deq unexpected return on lockid string
ORA-38312: original name is used by an existing object
ORA-13046: invalid number of arguments
ORA-01223: RESETLOGS must be specified to set a new database name
ORA-09831: snyStartThread: failed to build the server port set.
ORA-00319: log string of thread string has incorrect log reset status
IMG-00815: merged area queue free failed
LSX-00232: invalid unsigned long "~S"
PLW-05004: identifier string is also declared in STANDARD or is a SQL builtin