What are the steps that should be taken care of while deploying the code?
No Answer is Posted For this Question
Be the First to Post Answer
What is purpose business object?
What is purpose of decision stage?
Can blue prism platform be considered as safe and editable?
What is the difference between the when we are spying elements. In browses like ie and chrome?
Where are tags used in blue prism?
What systems can be integrated with blue prism robotically?
Is blue prism’s robotic automation platform secure and auditable?
What are the uses of tags in blue prism?
By default, stages used in object studio are logged and those in process studio are not in blue prism. Is this true or false?
How to move process to control room?
When exception caught, the Business Object/Process is said to be as?
What is a process design instruction (pdi)?