In my screen flow I have 4 assignments. When I am at 3rd assignment, I want to route it to a different user. How can it be done ?
Answer / Neha Jauhari
To route the control of a screen flow to a different user during an assignment in Pega, you can use the 'NextUser' or 'AssignmentUser' property. Set these properties to the desired user's name, and the control will be passed to that user after the current assignment. Alternatively, you can create a Ruleset containing multiple assignments and route it to the new user when needed.
| Is This Answer Correct ? | 0 Yes | 0 No |
Define what do you mean by calculate and edit declaratively not procedurally?
How to change rule availability?
How to see the values of the local variables of the activity?
If you have work experience on soap service. What are the rules required for soap service?
What is the use of property-set Method?
Do you have any idea about the aes?
Difference between split-join and split for each?
What's the differences between utility shape and notify shape?
How to get a property value from clipboard using java step?
How to implement Rule-Declare-Onchange?
What other benefits are achieved with PEGA’s RPA?
List out the benefits of PEGA robotics automation systems?