How can I get around the synchronization issue such that deletes and renames from VS.NET do not get synchronize with VSS as described in Q305516?
No Answer is Posted For this Question
Be the First to Post Answer
How do I get all users out of VSS in order to perform a backup?
What was fixed by Service Pack 3 for Visual Studio?
How do I display a custom message box during Add Item, Check In, Ckeck Out, Undo Checkout, Branch, and Rename?
Using the VSS OLE Automation support in ASP pages?
How to Save a Package as a Separate File?
How do I find all changes between two dates?
How to require check-in comments?
Is there some way to get a list of errors from Analyze?
How do I reconnect a project after the shared workspace file loses the project location?
How to Create a New Shared CaseComplete Project?
How to Undo a Checkout?
Tell me can database be accessed without sharing the folder?