Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

RASA Interview Questions
Questions Answers Views Company eMail

For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor

1 3168

Post New RASA Interview Questions




Un-Answered Questions

This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

1993


How to add behavior to an element using javascript?

535


Does spring bean provide thread safety?

157


Is the nyquist theorem true for optical fibre or only for copper wire ? Explain.

2740


How do I activate the real time safe block list?

654






What is use of inner class in java?

506


What is 'Account Conditioning'?

3967


What is target oriented sales?

669


how to calculate power consumption in slip ring motor at different step

1698


Why is html_ajax having stability issues on some installations?

522


Will Macrophage Survive without changing media ?

1470


in qtp 3 sheets is there in data table like global, action1, action2. I want to check the rows and columns in action2. how can check using script?

6304


Do we need antivirus for windows 10?

418


Give some best books to a.i?

481


What are the factors which influence the choice of specific magnetic and electric loadings of a synchronous machine?

1581