With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Define interface class in c#?
What is merge?
Define vouching?
Do You Expect Capital Demand In The System To Increase On Average Due To The Stress Test Exercise?
How to Disable Full Window Drag?
Explain the main causes of the loss of the biological diversity nowadays?
How do you bound inbound and outbound plugs in window?
How do you open .db files?
Tell us the difference between telnet and ssh?
What is a financial statement version?
Write the syntax for creating a collection and dropping a collection in mongodb.
What is a data list?
Can size_t be negative?
How do I view xml data?