Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Engineers India Limited interview questions (54)
  • Engineers India Limited technical test questions (5)



Engineers India Limited MAT Interview Questions
Questions Answers Views Company eMail

jawaharlal nehru award given to which country president in 2006?

1 4089

Post New Engineers India Limited MAT Interview Questions



Un-Answered Questions

Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

5058


what are the differences between malloc() and calloc() in c language?

985


What do you use to write documentation? Editor? Mail reader?

907


Are you sure that you can convince (persuade) the vendors to accept our company’s conditions?

1356


over draft balance as per cash book (journal entries needed) a,cheques deposited in bank but no entry was passed in cashbook b, credit side of the bank, column cash short c, chques received but not sent to bank d, insurance premium paid by bank as per standing instructions e, credit side of bank, coloumn cash short f, bank charges entered in cash book twice g, cheques received returned by bank but no entry passed h, cheques issued returned on technical grounds i, bills directly collected by bank j, bank charges debited by bank k, cheques received entered twice l, bills discounted dishonoured

1405






Can Apache Kafka be used without Zookeeper?

95


What is the physical significant of power factor?

567


why the hysteresis is necessary?

1215


how to import specifically 2nd column elements to runtime datatable in excel sheet if it contains 3 columns

873


What is the formula to calculate a three phase alternator

898


where is the cache (lookup, index) created and how can you see it.

810


How to start SQL Server in minimal configuration mode?

4842


how to write manual testcases for download the files from the template. for example:from product cost enddate

673


Methodology for calibration for ctm.... Explain in simple way pls

309


We are Storage tank Fabricator having SSI unit.Whether we are liable to pay Service tax or not. If yes then what is the exemption for us?

740






Engineers India Limited MAT Interview Questions
  • Civil Engineering (9)
  • Mechanical Engineering (6)
  • Electrical Engineering (19)
  • Instrumentation (4)
  • Accounting General (1)
  • General Knowledge_Current Affairs (18)
  • Government AllOther (1)
  • MAT (1)