Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Airtel aptitute test questions (4)
  • Airtel interview questions (120)
  • Airtel placement papers (3)
  • Airtel technical test questions (16)



Airtel Networking Administration Interview Questions
Questions Answers Views Company eMail

what is the difference between between win 2000 and win 2003 and win 2008

6 7355

Post New Airtel Networking Administration Interview Questions



Un-Answered Questions

How do you use the value set in bex query?

1197


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

841


where can the transformer having vector group Yny0 be used??

2245


Calculate the line size for a cooling water line with a volumetric flowrate of 1200m3/h of water. Density of water = 1000kg/m3

703


How to Use JPEGs from resource files ?

764






What is the sql query to find the employee who has Nth maximum salary?

2492


What are the different types of excise exemptions?

1011


how to change the instance-operating unit?

689


What is perceptual constancy ?why it is biologically important?

1369


{in tally}in inventory info what is (stock group, stock categori, stock item,reorder levels) why we has to prepare them?

997


How to reduce -234126219.6403 MVAr generation and by what?

397


What is Twisted Pair ?

623


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF Govt Polytechnic in deee 2nd year papers

1418


how many types of thyristor are? shortly define them with purpose, application & working principle?

682


i am arun, as of now i am working in a power plant. I did B.E mech and have completed PGDC in thermal power plant engineering from NPTI(NATIONAL POWER TRAINING INSTITUTE). I started my career in software oly , as i dono any software languages i got failed in conformation exam. Pls help me , i want to enter software field. in this powerplant field 6 working days for week and holiday is also not sunday, i am not able 2 tc of my family... pls help me how to enter sf fielf. my frds sujjested me 2 try as functional after 2 years. wats the procedure for that... pls pls help me in this issue I have 1 year exp in power plant, i knew mechanical design software. my id : arun0029@gmail.com

933






Airtel Networking Administration Interview Questions
  • Tcl (1)
  • Protocols AllOther (1)
  • Networking Administration (1)
  • Networking Security (2)
  • Networking AllOther (1)
  • ASP.NET (2)
  • Microsoft Related AllOther (1)
  • Windows General (1)
  • Linux Commands (1)
  • Operating Systems AllOther (1)
  • Automation Testing AllOther (1)
  • RPG400 (1)
  • Telecom Hardware (1)
  • WiFi Protocols (1)
  • GSM (1)
  • CDMA (1)
  • BlueTooth (1)
  • Telecom General (4)
  • Apache Hadoop (1)
  • Civil Engineering (1)
  • Mechanical Engineering (1)
  • Electrical Engineering (13)
  • Electronics Communications (14)
  • Power Plant Engineering (1)
  • Marketing Sales (11)
  • Human Resources (3)
  • Personnel Management (1)
  • Non Technical (1)
  • Audit (2)
  • Taxation (5)
  • Accounting General (2)
  • Accounting AllOther (8)
  • Call Centre AllOther (39)
  • UPSC History (1)
  • RRB (1)
  • BSRB AllOther (1)
  • APPSC AllOther (1)
  • General Knowledge_Current Affairs (3)
  • Funny Interview Questions (1)
  • Everything Else AllOther (2)
  • Placement Papers (3)
  • CCNA (3)
  • USA Student Visa F1 Visa (1)