Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • EE Limited interview questions (5)



EE Limited Manual Testing Interview Questions
Questions Answers Views Company eMail

how we conduct security testing in realtime,for every project we conduct security testig or not

1 4926

Post New EE Limited Manual Testing Interview Questions



Un-Answered Questions

pls give me presant awerness quistion and answer in my emailid.

1557


What the normal terms and conditions in a agreement while signing it with a supplier?

887


Describe the control mechanism of missile launcher???

782


IS code for grade of concrete for bamboo lintel????

919


Give me the asset revaluation (at the time of asset value increase & decrease) journal entrys?

849






If anybody have the ref. design book of the 3 point cylindrical rolling with sheet thickness of 2.3 mm & 67 mm internal diameter legth of 80 mm

643


Hi can you please help for the following. I have a ASP.Net web page I want to print the whole page how is it possible? I want It in ASP also.Please send me the solutions dipankar.hazari@gmail.com . Thanks in advance.

1448


HOW TO CREATE SRS REVIEW REPORT TO PL?

1176


what's the difference between impress cash account and petty cash account

207


what is solkor relay and which condition it will act?

1806


plz anyone provide me the sample test papers of ONGC as of i m from Mechanical engg bakground and would be appearing for the test in the june 2010. My email id - neeraj_94312@rediffmail.com

713


Hi Everybody, Can anybody tell me how to create ledger in Peachtree Accounting software, means there are some Code, which Codes Comes under which ledger Account.your prompt Answer will be highly appreciated, Thanks & regards, Khan

1490


how to connect your project in database?

749


MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)

976


What is unique about the company? - Venture Capitalists

293






EE Limited Manual Testing Interview Questions
    Manual Testing (1)
  • Oracle Apps Technical (1)
  • Oracle Apps Financial (1)
  • Civil Engineering (1)
  • Instrumentation (1)