There is 15 KVA UPS using for single phase load.And 30 batteries of 12 V, 100 Ah are connected in series. Load is taking 15 A current.What will be the back up power for this UPS on same load?
1 3636Post New Dynamic Software Electrical Engineering Interview Questions
What is space character in java?
What is a view engine?
What is #include stdio h?
What does recovering orphaned file mean?
Explain what is an application domain?
What is the use of function pointer?
What is the difference between bind and lexical parameter?
Why is jms used?
How do I automate reports using tableau software?
Which is better hadoop or spark?
How do I turn off marked suspect on my database in sybase?
How do I reduce the size of my access database?
Why is sql better than hql?
Explain the difference between a list and the tuple?
Write steps to write a handlebars helper?