1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3
12 232006Post New Gulf Civil Engineering Interview Questions
Does a Siebel server installation needs the gateway server installation?
What is exception? What are the types of exceptions?
What are the views in Hive?
What are the differences between service and factory methods?
Explain the different types of delegates used in c#.
Define water cycle?
Which symbol in blue prism, in control room pending or unworked item will be marked by?
Why do we need mongoose?
What is word-break property used in css3?
Why is the use of exit do or exit for statements within loops discouraged?
We have some pieces of metals that have been 'powder coated', how does that work?
Am studying basic c++ programming, have been given the following assignment. Design a linear program to calculate the maximum stress a material can withstand given a force and a diameter of a circle. To find the required area pi should be defined. Have most of the program sorted out but am at a loss as to how to show the calculations required. Can anyone help?
hi friends kumar here if anybody of u have essar placement papers than plz send it to me i need it urgently..ok mail id is kskalyani@gmail.com
if card punch operator can process 80 cards in half an hour how many cards can this process in 7hr 30min?
Does php 7 support mysql?