a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5
Explain different types of Normalization.
How the flow of the mail is tracked in ms exchange 2013?
What is the purpose of using payroll control record?
How can I copy the name of the worksheet tab to a cell in the worksheet?
What is difference between angular and angularjs?
How does RBI earn its profit?
What is the use of activex control in .net?
Explain about AFNetworking. What is the base class used in AFNetworking library
What is sizing in SAP HANA?
What is tooth extraction?
What do you mean by the network security groups?
Explain me what is the wordpress loop?
Hi Guys, my requirement is to load 1 yr data from oracle to teradata database through abinitio etl graph.i need to schedule this as a monthly job.but i want to load 12 month data for the first time and from second time it should load last (recent) month data and delete 13th month data. For example For the first time it should load 201208 to 201108 data, second time it should delete 201108 month data and load 201209 month data. I developed garph to load 12 month data ,but i don't know how to handle above requirement as am new to abinitio. i greatly appreciate you help.Thank You.
How do you concatenate the firstname and lastname from emp table to give a complete name?