Who wrote the national song ?Vande Matram?? (a) Aurobindo Ghose (b) Bankim Chandra Chatterjee (c) Rabindranath Tagore (d) Sarat Chandra Chatterji
8 15187Post New HB Interview Questions
What are memory tables?
Explain what is a staging area? Do we need it? What is the purpose of a staging area?
How do I open the toolbox in visual studio?
You can create a string object as string str = “abc”; why cant a button object be created as button bt = “abc”;? Explain
What is cucumber? What are the advantages of cucumber?
What are the shortcut keys for autosum?
Why do my scrollbars go to row 500 -- my data ends in cell e50?
Is bean a singleton?
What is plogi adays authorization switch?
what is PhaseIII, ODS, TLG, Macro and Proc in SAS
Define a fan trap and how it can be illuminated? : sap bobi
What is the difference between informatica 7.0 and 8.0?
What are null cells?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
What is Pic 9v99 Indicates in COBOL?