In the creation of the material master if user maintains MRP Type as ‘VB’ (Manual reorder point planning) unless until user will not maintain the Reorder point Qty & fixed lot size Qty system will not allow creating the material which is right process. Hence the same rule should be applied for MRP Type ‘ND’ also. So that user cannot fill the MRP Data unless he will not choose ‘VB’
2803Post New Saudi Ceramics IT Management Interview Questions
How was ajax killed?
What is visual c# net?
Explain what is sequencefileinputformat?
What is gutter in newspaper?
what is the job responsilties of Sr. engineer in QA/QC deptt.
What is the benefit of entity framework?
How can I use single quotes in single quotes in php?
What is difference between static and dynamic array?
What is type checking in c#?
How do I insert a list of figures in word 2013?
what is TAS language which is used as a language for some projects/
what is the difference configurable items and non configurable items ?
what is anchorage length,lap length and (dont remember the last one)
What is sap sql anywhere?
What is Workstation ?