Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

TISL MySQL Interview Questions
Questions Answers Views Company eMail

What is the maximum length of a table name, database name, and fieldname in MySQL?

3 31208

Post New TISL MySQL Interview Questions




Un-Answered Questions

How is a function declared? Why are Kotlin functions known as top-level functions?

312


what is the difference between valuation class and valuation category ?

122


which materials can l use if l want to use length wave 680 to 900 in hplc

2088


Why do all model object attributes get marked with @dynamic and not synthesised? What does @dynamic mean?

846


How do you load more than 1 max sal in each department through informatica or write sql query in oracle?

1685


how can you do retesting (datadriven test) using notepad amd by using functions NOTE u should not use datatable methods

2024


How do I remove duplicates in two columns?

1201


In a Impedance Based Distance Relay (Quad Characteristics) - Could there be two different Line Angle(RCA) for Ph-Ph & Ph-Gnd? If So Kindly Let me Know.. Where, What are the advantages of the same?

1527


Tell me are you comfortable making cold calls here? : insurance cold calling

598


What do you do, and what is your professional background?

73


Can free-form SQL queries be used with Sqoop import command? If yes, then how can they be used?

71


Hi every one ! You people are doing a great job here , Im going to attend Tata Technologies interivew on this sunday,Can anyone who has already attended this company interivew or other companies interivews in abap pls share ur experience with me and help me to get into job my id ushareddyabap@gmail.com. Thankyou verymcuh

2019


On a scale of one to ten, rate me as an interviewer now 26 which stack is used in 8086?

1068


The Tabula Manufacturing Company has been in business for one month. At the end of month the company had the following accounts: Materials used K 5 000.00 Direct labour 10 000.00 Indirect labour 3 000.00 Indirect materials 2 000.00 Labour fringe benefits 1 000.00 Supervisor’s salary 1 000.00 Depreciation Machinery 2 000.00 Miscellaneous factory overhead 1 000.00 Heat and light 500.00 Insurance on plant 1 500.00 The company processed two jobs during the month with costs as follows: Job 101 Job 102 Materials cost K3 000.00 K2 000.00 Direct labour cost K6 000.00 K4 000.00 Direct labour hours 4 000.00 3 000.00 Machine hours 2 000.00 1 000.00 The company does not use a predetermined rate for factory overhead. The rate is computed at the end of each month. Required Use both the direct labour hours and machine hours to compute: 1) The overhead rates for the month (5 pts) 2) The overhead cost for each job (5pts) 3) The total cost for each job (10 pts) 4) Briefly describe the difference between Job order and process costing, citing relevant examples (5 pts).

2200


use of split range ? where it is used ? in which control loop it is used ?

2044