Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Australia Visa interview questions (6)
  • Australia Visa technical test questions (1)



Australia Visa Australia Visa Interview Questions
Questions Answers Views Company eMail

can i get sample cdr report for electrical engineer? hi friends, i am a electrical engineer working as a mep estimator in a building construction company. i am planning to migrate to australia. i am little confused to write. if i get some sample cdr based on that i will prepare mine. please someone help me on this. my mail id- psmbvani@yahoo.co.in

2 7059

Hi i have done Diploma in electrical engineering and i have applied for Skill immigration for Australia under General Electrician catagory. I need help regarding to the skill test (practical Test). If any body has completed this test. i need some ideas about quastion and answer and type of prectical test.

3 7658

i have submit my documents for australia visa i m going dere to celebrate my silver jubilee so i want to know dat wat questions they will ask me for visa approval

1285

Post New Australia Visa Australia Visa Interview Questions



Un-Answered Questions

How can a telco testing is done?Can anyone help out me to show how does the telco application look like?

706


what is the basic need for designing the bottle filling machines

1018


I want to do correspondence course related for taxation, where I can learn income tax, service tax, sales tax etc. Any one can suggest from which university can I do and name of the course also.

1032


we have syntax like for(int var : arrayName) this syntax is to find whether a number is in the array or not.but i want to know how to find that number's location.

750


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1051






What are different deliverables according to phases?

2148


Explain how thw analog to digital converter works with the circuit diagram

1182


What happened ,If 3 phase clearance not maintained in 33KV Line,11KV LIne etc?

987


1)for snapshot replication which agents used? 2)for Transcation replication which agents used? 3)for merge replciation which agents used?

871


hi all.. I need your advice.. I attended interview for tcs bpo for investment banking process. can anyone tell me what will be the shift timings... will it be full night shifts??? they told it is rotational shifts...

613


What Tuxedo process boot?

312


What do you understand by the term ‘structured cabling’. State the main rules that should be used when installing a cable. 31. Show that maximum cabling area for LAN for horizontal cabling runs is approximately 200m.

293


what is metal of piston ring

707


what is fullform of ge 9ea gas turbine

2231


whare exactly we have to use functions and sub routain

857






Australia Visa Australia Visa Interview Questions
  • Electrical Engineering (1)
  • Accounting AllOther (1)
  • General Knowledge_Current Affairs (2)
  • Australia Visa (3)