Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • ATS aptitute test questions (1)
  • ATS interview questions (19)
  • ATS technical test questions (3)



ATS PHP Interview Questions
Questions Answers Views Company eMail

how to send mail in php but mail should be send in inbox not in spam.....:(

2 3253

Write a query to to delete duplicate rows?

4 4410

Post New ATS PHP Interview Questions



Un-Answered Questions

Debugger what are the modules, what are the options you can specify when using debugger, can you change the expression condition dynamically when the debugger is running.

989


Can u give the Documentation of Custom.pll in oracle apps

2101


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

5166


what is the difference between vat return and return for remittance on value added tax.

1247


Please suggest ME which institute is best for sap mm and kindly let me know which institute Mr.Syed Quarish is working and his contact no? and who is expert in teaching test scrips and CIN

543






What are the multivariate techniques?

1435


in the design of a rack and pinion with the pinion having a pitch of 4in and a teeth number of 45,how many teeth should a rack of length 196.850in have

962


What is the formula of staffing

1151


Are VRE clients isolated?

760


What are the limitations of importing RDBMS tables into Hcatalog directly?

118


What are the different type of BOM usage?

430


what is the best cell culture media for in vivo imaging ?

901


Discuss the major features of at least two very different nervous systems (i.e. jellyfish, locust, lamprey, octopus, owl, rat, monkey). In what ways might the features of each system affect neural processing?

882


Explain me ETL project architecture in Detail?

353


how lookup transformation is made active in new versions... When to use connected and when to use unconnected lookup and why? which is good for session performance. How to make lookup persistent and how to remove stale data from that lookup. how commit works - when we stop or abort data. Explain in both cases. What is factless fact table and have you ever used it in real time scenarios.

379






ATS PHP Interview Questions
  • OOPS (1)
  • PHP (2)
  • Networking Security (1)
  • C Sharp (1)
  • Automation Testing AllOther (1)
  • 86 Family (1)
  • Civil Engineering (10)
  • Mechanical Engineering (1)
  • Electrical Engineering (1)
  • Taxation (1)
  • Accounting General (1)
  • Accounting AllOther (1)
  • General Aptitude (1)