Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Orange interview questions (12)
  • Orange placement papers (1)



Orange Oracle Errors Interview Questions
Questions Answers Views Company eMail

ORA-12710: CREATE CONTROLFILE character set is not known

1 6246

Post New Orange Oracle Errors Interview Questions



Un-Answered Questions

compare the delay in sending x-bit msg over k-hop path in ckt switched nw nin lightil loaded packet swithed nw. the ckt setup time is s per hop,the packet size is p bits n data rate is' b' bps under what condition does packet nw have lower delay?

651


How are security issues debugged?

1429


sir, pls mail me the previous question papers of RRB Junior Engineer Gr-II Drawing

782


why sielent pole is used only in hydro generators and not in turbo generators

2430


How to move a CS-RCS project to CS-CVS?

1241






Can you please provide me the present VAT precentages in Andhra pradesh and other states CST persentages with good's wise.

900


Which FM do you use to find out who is reporting to whom

4117


what is cogging and crawling

1285


Where do you found that you can't use winrunner for automation?

890


if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.

887


What is Web architecture that are followed while doing online project and tell the samples of architecture?

1095


What is granularity? Please explain with example

349


Array base access faster or pointer base access is faster?

1180


sir, kindly explain to me that how to calculate volume of torrispherical vessel which is used in pharma company ss reactor bottom dish volume. thank u.

1402


I just purchased a 4 position cam switch to be used to operate a 3-speed blower motor. The motor is a 10 amp motor and has 3 wires that are used to control speed. The cam switch was rated at 660V 20 amps but when I received it, I noticed that it has AC-15 operational current rating (Ie) of 4/5 amps. If I am reading the label correctly. the 4/5 amps is related to 440v/220V (Ue). Other ratings are AC-3: 5.5A, AC2: 7.5A and AC-4: 1.5A. My questions are 1) Is it safe to use this switch with the motor I have 2) what is the difference between the 20 amp Ith ratting and the Ie operational ratings?

540






Orange Oracle Errors Interview Questions
  • Networking Administration (1)
  • Load Runner (3)
  • QTP (1)
  • SAP ABAP (1)
  • Oracle Apps Financial (1)
  • Electrical Engineering (1)
  • Engineering AllOther (1)
  • Business Administration (1)
  • Call Centre AllOther (1)
  • CISA Certification (1)
  • Oracle Errors (1)