sort term descripttion form, report and uery
What is the Accounts Payable & Accounts Receivable ?
1. What is Container? 2. Tell me about your project? 3. Which container you are used in your project? 4. What is Surrogate key? 5. How you are implemented it? 6. Difference between Server job and Parallel job? 7. What is your Target Database? 8. What is Source System? 9. Difference between Join and Lookup? 10. Are you maintaining historical data? What is the logic used to maintained to historical data? 11. Do you have documents for mapping?
hi frinds i need help .i have 4 + yrs exp in testing and nearly 2 yrs exp in QTP and QC .currently iam working north fast 2 yrs iam looking for job in south is there any openings plz letme know my mail id is pbre1980@gmail.com
What is the meaning of your name?
sir/ madam i m apearing to rrb bhubaneswar for entrans exam please i want a help to get thruogh this
Hi, i am looking job in perfomance testing using Loadrunner can any body help me a project in any domine plz(Usah) chs_29@rediffmail.com
What is the last major networking problem you troubleshot and solved on your own in the last year?
I have two different source structure tables, but I want to load into single target table? How do I go about it? Explain in detail through mapping flow.
The Tabula Manufacturing Company has been in business for one month. At the end of month the company had the following accounts: Materials used K 5 000.00 Direct labour 10 000.00 Indirect labour 3 000.00 Indirect materials 2 000.00 Labour fringe benefits 1 000.00 Supervisor’s salary 1 000.00 Depreciation Machinery 2 000.00 Miscellaneous factory overhead 1 000.00 Heat and light 500.00 Insurance on plant 1 500.00 The company processed two jobs during the month with costs as follows: Job 101 Job 102 Materials cost K3 000.00 K2 000.00 Direct labour cost K6 000.00 K4 000.00 Direct labour hours 4 000.00 3 000.00 Machine hours 2 000.00 1 000.00 The company does not use a predetermined rate for factory overhead. The rate is computed at the end of each month. Required Use both the direct labour hours and machine hours to compute: 1) The overhead rates for the month (5 pts) 2) The overhead cost for each job (5pts) 3) The total cost for each job (10 pts) 4) Briefly describe the difference between Job order and process costing, citing relevant examples (5 pts).
Draw the space diagram for a ten meter long beam simply supported at each end?
I have 2500KVA transformer delta/star,13.8KV/380V provided with LV 4000A breaker. Already I have 2300KW motor feeder with a full load 90%. Is it possible to connect another 1600A from that breaker? If so how the calculation is done?
Tell me have you developed custom transaction software?
sir i want previous entrance exam papers for written test
tell about your native place and famous places near to it.