What is down-sizing?
how to calculate the step resistance for slipring induction motor,how you deside the no of step for that?
Explain the name of the largest volcano in the world?
What are the essential hooping tools that improve performance? Big data?
How to embed video and audio in html5?
How can you write a comment in swift?
What is the best Macanism to clear the Cache in asp.net
Tell us what is your training in machine learning and what types of hands-on experience do you have?
Explain cspack in microsoft azure?
What is integers and example?
if i have a comany take contract from gvt. & i take contract from that company, & in his bill he show about all tax deduction ike IT, WCT etc, but material is purchase by that company not by us so here i want to know how WCT applicable? on total amount of contract or according to rule like material service & after adding all things??
How to make SUN server as router in subnetwork?
Hello I am rohit I have done BE but i have got the job in a start up comp. as a management trainee now I don't know what to learn Please help Me Thanks Rohit
How you can access to cobra objects in orbix?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.