Post New Medhaj Techno Concept Electrical Engineering Interview Questions
You are a project manager for Laurel's theater productions. Your new project is coming in over budget and requires a cost change through the cost change control system. You know all of the following are true regarding Cost Control except: A. Performance is monitored to detect variances B. Changes are reflected in the cost baseline C. Changes are monitored and reflected in the project scope D. Changes are monitored so that inappropriate changes do not get into the cost baseline
9).explain difference between stab & driver? 10). who will conduct integration testing? 11). explain difference between system testing & functionality testing? 12). explain compatibility testing? 13). explain performance testing? 14). explain inter system testing? 15). explain difference between smoke testing & sanity testing? 16). explain difference between re-testing & regression testing? 17). you prefer manual testing or automation
Mention the differences between blue prism, uipath, and automation anywhere.
What is posix in perl?
Explain path testing?
Which is faster count (*) or count 1?
Why Does Excel Have Two Macro Languages?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What parameters to be reported when we send lubricating oil for shore analysis?
What is retroactive accounting period in sap hr
Suppose that, even unrealistically, we are to search a list of 700 million items using Binary Search, Recursion (the algorithm given in class). What is the maximum number of comparisons that this algorithm must perform before finding a given item or concluding that it is not in the list?
Clarify what webdav is in hadoop?
How to use 'mysql' to run sql statements?
Tell me how are macros different from inline functions?
What is grey box testing?