how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr
brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Answer Posted / Supranshu Saurabh Vir Singh
To calculate the quantities of bricks, cement, and sand for a 1m x 0.23m x 1m brickwork (1:4) with a 230mm thick wall and 10mm thick mortar, you can follow these steps:nnFirst, find the volume of the brickwork:nVolume = Length x Width x Height = 1m x 0.23m x 1m = 0.23 cubic metersnnNext, calculate the volume of one brick:nBrick Volume = (Length x Breadth x Height) / Number of Bricks per Cubic Meter = (230mm x 70mm x 110mm) / 96 (since there are 96 bricks per cubic meter for a 1:4 mix)nBrick Volume = 8.63 cubic centimetersnnThen, calculate the number of bricks required:nNumber of Bricks = Total Brickwork Volume / Brick Volume = 0.23m³ / 8.63 x 10^(-5) m³/brick ≈ 2684 bricksnnFinally, calculate the quantities of cement and sand required:nCement: 1 part cement : 4 parts sand : 6.5 parts aggregate (based on the 1:4 mix)nSo, for 1000 kg of cement, you would need 4000 kg of sand and 6500 kg of aggregate.nSince 1 m³ of concrete requires approximately 350 kg of cement, you can calculate the quantities for the entire project.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
HOw much % of premium on DSR-2013 currently
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
400 ku d/c clearess ketan hota hai?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is the difference between replacement of cement by groundnut shell ash
What is the per cu. mt. price of ready mix in Gujarat region.?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
can i get civil engineering test papers.......?????
plz.show development and anchorage length in simple diagram.
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
material used for mendrel use to bend epoxy coated rebar
water leak detection system question & answer