cement and sand required for one block of size 0.23*0.15*0.46
Answer Posted / Ashish Rastogi
To calculate the quantity of cement and sand required for a concrete block with dimensions 0.23 m * 0.15 m * 0.46 m, we first need to determine the volume of the block. The volume is 0.23 m * 0.15 m * 0.46 m = 0.01893 m³. Assuming a ratio of 1:3 for cement and sand (i.e., 1 part cement to 3 parts sand), the quantity of cement required would be approximately 0.01893 m³ / 0.25 = 0.07572 m³, and the quantity of sand required would be 3 * 0.07572 m³ = 0.22716 m³.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Technical Question of Civil Engineering
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
can i get civil engineering test papers.......?????
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
water leak detection system question & answer
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
I need to constructive work in amaraj batteries
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
What is the per cu. mt. price of ready mix in Gujarat region.?