adspace
How many litres of water used for curing of 1000sqft of slav
Answer Posted / Santosh Kumar Mishra
The amount of water required to cure a 1000 sq ft concrete slab depends on the specific mix design and environmental conditions. As a rough estimate, a common mix design requires about 25 gallons (94.6 liters) of water per cubic yard of concrete, with an average density of 145 pcf (pounds per cubic foot). Given that there are approximately 9 square feet in one square yard, a 1000 sq ft slab would require around 109.7 cubic yards of concrete. Using the water-to-concrete ratio mentioned above, this amounts to roughly 2845 gallons (approximately 10,637 liters) of water for curing.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Technical Question of Civil Engineering
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
I need to constructive work in amaraj batteries
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
VAT and CST ? Which benefits for buyer ? Why benefits?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
Why do you want to work here
What is Density of cement, sand & aggregate ?
water leak detection system question & answer
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.