Answer Posted / sekar.k
Tremie concrete means,The concrete delivered through the
pipe (tremie pipe), Generally tremie concrete usefull in
pile foundation (pile).The size of the pipe not less than
200mm.for this type of concrete 20mm aggregate to be used.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What in your past experience or education prepares you for the position for which you are applying
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
What are some facts about concrete?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
what mean By core Billing
what is the coefficient for running feet to cft coversion both area and price
How to calculate woden area in sft and Cft
What are the advantages of cad software’s?
reinforcement slab, beam and column formulas?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently