Answer Posted /

Is This Answer Correct ?    Yes No




Post New Answer   View All Answers


Please Help Members By Posting Answers For Below Questions

What is special procurement & tell one special procurement briefly

308


can i get d full details about group-1 iam gng 2 prepare for the post of dsp

1432


can anyody please send me the dump for Oracle 10g certifications for DBA path?

734


Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.

511


please send me latest Aptitude Test paper

657


What is the process to enhance the Infotype

1605


What are the KRA of an asst manager in Domestic outbound Callcenter

479


What is the sql query to find the employee who has Nth maximum salary?

2049


What is third generation HPLC Columns?

224


How could your firm change its organization, processes, and culture to compete more effectively?

182


whenever install patch cluster, system will be restart what is the problem?

443


sir am writing aso(assistant statistical officer) exam first time, so please send me previous papers, and syllabus. my optional subject is statistics

673


create Drop-Down Navigation Menus

892


What is Wavelength sensitivity?

240


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

873