How much percent dry volume consider for concrete
Answer Posted / syed amjad.amjad_hashmi786@red
for 1 cum 52%
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
What are your future hopes for this job?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
what is the list of building construction equipment & teir output?
Define a polyline?
what is the mode of method of face bar measurement
What do you mean by the word 'shear'?
how to calculate the density for high density concrete ? or is it same as the density of RC?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
what are the Task work of different labour.?
How much percentage of brick bats allowed in CD-75 bricks
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What is the development length given in pile?
What things architect have to take care of before starting any project?