what are smoke detectors ?
Answer Posted / munish
smoke detector is used for detect the smoke.it is connected
to fire alarm panel with parallel a resistance.
in smoke & heat detactor connections + is connected in
series with other smoke detactors & - is connected in
parallel. and in last detector a resisitance is connected
B/W + out & negative.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Between educational qualification and practical work experience, give us a brief explanation on your practical experience in your past Endeavour that you performed well to the satisfaction of your past or present employer?
pls tell me function of closing coil of A.C.B.
Hi, This is Laila. I am selected for syndicate bank interview. Could you please share your views and the questions asked if you have faced the interview My email id is laila_honey09@yahoo.com Please send as fast as u can.Thank You Thanks... Laila.
State uses of different types of stsrters with different capacities of motors as below: a. up to 5HP b. above 5hp to 10hp c. above 10hp to 20hp d. above 20hp
Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?
What is bode plot?
What do you mean by lighting transformer?
i am an maintenance engineer. one distribution board have 5 feeder. recently its ELR trips frequently, but it take some times after trip( 10min,20min..)but 3 feeder no load. two feeder only loaded. i checked one feeder IR value all values are above 50Mohm.but B phase to Earth is only 9Mohm.any problem about low value
how to wiring it with contactor and timer together
What are the main significances of root locus?
Is it good to short Neutral and Ground in the PLC or DCS main Power supply. Pls give YES or NO with reasons...? Simarpreet
what is the difference between the characteristics of two different phase bushing of any transformer
How RTCC panel is working and give single line diagram for RTCC with transformer?
Why we are going for converter transformers for DC drives application instead of distribution transformer?
WHTA IS LIMT OF LEAKGE CURRENT OF 11 KV 1 CORE 1000SQ.MM. XLPE CABLE.LOAD ON CABLE IS AROUND 600AMP .LENGTH 500 MTRS.