Answer Posted / yas
pile is used to transmit load form structure to earth.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
how much cement sand n bricks required in im3?and how much in plaster?
What is the quantity of cement in mix m20 concrete?
Write short note on construction programme for pile foundation.
What in your past experience or education prepares you for the position for which you are applying
List out some of the software program that can be useful for architect?
How to calculate paint drums per meter square
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Define block?
Explain moment of inertia?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
Dear Sir What is the Contraction joint for base Slab
List out the potential risk factors for workers on the construction site?