how to calculate the volume of water in the water tank
(5'x5'x5')? what"s the formula?
Answer Posted / sachin kesarkar
assuming free board=150mm=.5feet
hence height=4.5feets
now total volume=5*5*4.5=112.5cubic feet
hence112.5/35.28=3.18cubic metres
now 1metre cube=1000litres
hence 3.18*1000=3180litres
| Is This Answer Correct ? | 54 Yes | 22 No |
Post New Answer View All Answers
how much cost of single coat 20mm thick plastering per sqre meter
Coverage of 25mm.thick ratio of 1:4 cement mortar?
what discoveries did you have in relation to your course?
how to find out hard strata in bored pile when the DMC method adopted.
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
What is costing in 100squre feet bricks
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
In cement making,what is meaning of blend,fineness,density.
Explain the various stages of the project planning process in construction?
How to decide/consider the grade of bitumen for dbm.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
how to calculate spacing rod in column