Difference b/w SCADA & DCS

Answer Posted / gayathri

Scada = Display Unit.

DCS = Controller with the Display unit.

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi i am aneesh, done btech in applied electronics & instrumentatiin. And then i took mba in finance & marketing.After that i got placement in finance co and worked there for 3.5 yrs.Now i wanted to come back to engineering job.But without engg experience, i may not able to find an opening.i have done a course related to flow meters and ite calibrations. Kindly suggest where should i try to get a job?

1528


Full form of KKS when use DCS.

2597


Hi,can anyone help me out with PhD programs related to Instrumentation field?I have a degree in electronic Instrumentation?

1470


Is there any relation between Artificial Intelligence and Instrumentation?

578


What is the difference between mmwc and mmwg?

842






Why use ball valves on Gas pipelines instead of gate & or globe valves...means basic diffrence or use of these valves..how designers knows this type of valve with rating is required...

1827


when a magnet is heated?

1515


why we take %i0.0 as input for twido plc

1646


CONTROL VALVE OPERATING IN MANUAL BUT NOT IN MANUAL. WHAT SHOULD BE THE PROBLEM ?

1450


Please asked me How calculate DCS controller memory.

2328


Explain the working of rota meter.

753


I need control valve ISA hand book. Is there any site to download that big book containing all the pages. Written by Paul Friedmann

1867


how to control pid

1449


what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.

1610


Actual using of tube bender to bend 2 opposite 90 deg at correct measurement center to center of tubing.

1489