What is meant by single cycle plan ?how it works?
Answer Posted / venu
A single cycle maintenance plan is Time-based or
performance based plan.No stratrgy is assigned.
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
What is concept of equipment numbering?
How pm module is integrated with co module?
Why does settlement of a maintenance order is important?
What is preventive maintenance and key submodules under this?
How a general task list is different from equipment and functional location?
Which work center category is used for plant maintenance work center?
What must you do if you have assets (functional locations) with the same number in several plants?
What is purpose of maintenance activity type in maintenance order?
A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
How overheades are calculated and from where the formula is picked?
When do you perform breakdown maintenance?
What is purpose of offset entry in single cycle maintenance plan?
What is the use of the field “standing order”?
Is it possible to create and schedule a maintenance plan without task list?
What is corrective maintenance?