Answer Posted /

Is This Answer Correct ?    Yes No




Post New Answer   View All Answers


Please Help Members By Posting Answers For Below Questions

please send chennai rrb je question papers please send urgently

524


What is the state if the RED LED is glowing on DVxx card What is the state if the YELLOW LED is glowing on DVxx card What is the state if the GREEN LED is glowing on DVxx card Which frequency band DVDC is used Which frequency band DVGA is used

585


How does sunlight affect plants?

767


Hi All... PLease send me if anyone have "Information Security Officer" Aptitude papers. Please Mail me at mannusanghi@gmail.com

587


please tell me about Pass rule

761


What is the cst rate (west bengal) of hosiery goods when we purchase from outside west bengal ?

339


i want to know the genral questions in interviews if any body knows pls help me

690


What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

597


Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.

1577


A Company has not deposited its ESI /PF dues from 01-04-10 till 31-12-10 in a year (Both the shares). What is the maximum time limit for that and is the liability as on date. Management wants to daly at the maximum, but want the calculations of each & every aspect- monthwise. The avrerage no. of employees are 50 and the salary is around 2.00 to 2.5 Lacs per month.

640


Shall i get the model question papers for junior lecture of Andhra pradesh

1443


Why is a data link layer switch preferred over a hub ?

324


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

502


Is it mandatory for the employees staff of a School, if so give details

616


how can i improve myself in solving apptitude questions, guide and help me with some kind of tips.suggest me books too.so that i can get betterment in solving apps

1674