Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Which is not formally included in Test Plan?
1)Features to be tested 2)Incident reports 3)Risks 4)
Schedule Pls reply .Thanks

Answer Posted / babitha.b

To include:
Features to be tested since some of them can be test at
rela time for some of them we can test using simulator.if
we give them what we r testing then at other end they can
arrange for other cases.and also some internal features
also we cant test just like internal memory or addresses.
so its mandatory to include it.

Risks: here we might be saying some risks like environmenmt
supports or operating systems we using,language dependent
issues.
assumptions and constraints also we can include in test
plan.
schedule: conveying them about our flow of testing which
means first we perform GUI testing,fucntionality
testing,integration and system.
But incident reports is not necessary.Because we would be
updating our test plan usually.
So if we are facing incident then we need to analyse it and
add it to the test plan by adding either in risky
section,constraint section..incase if it can be overcome by
any other testing methodology then we can add those in our
testing technoque

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can you tell me how to write test cases for payments, receipts, inward clearing, outward clearing, A/c statements ?

2063


What is showstopper defect?

1144


How will you determine when to stop testing?

1035


can someone give me a brief idea about embedded testing.. i know both embedded system concepts and testing concepts.. i just want to know what we have to do for embedded testing

2289


what is difference between win 98 and win 2000 poertating system?which is better one?

2224


What were the major challenges u faced while testing

2449


What is positive and negative testing?

1078


what are the risks and contingencies u had in ur project?

2465


What are the bussiness scenories?

3354


what is the technical challange you faced in your module.please ans me the question i just want example can me any example please very important

1887


When the GUI Testing will be held on the V model ?

2151


Should testing be done only after the build and execution phases are complete?

1568


can you show me the test cases on registration form

1682


Have u ever done testing related to a database,give examples to support u r answer.

2115


What are the modules of quality center?

1163