Which is not formally included in Test Plan?
1)Features to be tested 2)Incident reports 3)Risks 4)
Schedule Pls reply .Thanks
Answer Posted / babitha.b
To include:
Features to be tested since some of them can be test at
rela time for some of them we can test using simulator.if
we give them what we r testing then at other end they can
arrange for other cases.and also some internal features
also we cant test just like internal memory or addresses.
so its mandatory to include it.
Risks: here we might be saying some risks like environmenmt
supports or operating systems we using,language dependent
issues.
assumptions and constraints also we can include in test
plan.
schedule: conveying them about our flow of testing which
means first we perform GUI testing,fucntionality
testing,integration and system.
But incident reports is not necessary.Because we would be
updating our test plan usually.
So if we are facing incident then we need to analyse it and
add it to the test plan by adding either in risky
section,constraint section..incase if it can be overcome by
any other testing methodology then we can add those in our
testing technoque
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?
how mapp the defect id in quality center?
what risks do u faced u r projest how do you solve
Build with fixes has been deployed on QA environment if asked by your manager to reproduce how can you reproduce the issues? (by using the previous build) Can you access the previous build? If so ,what are the tools or how can you access?
What will be your approach if a particular script in Load Test fails?
How is ‘build’ different from ‘release’?
What do you understand by usability testing?
what does 80hz refresh rate indicates?
If automating - what is your process for determining what to automate and in what order
Changes and enhancements to system?
What is unit level testing?
difference between change management and configuration management
Hi.....wat r d major bugs we can find in banking domain???
What is test out put?
what are the test bugs