For what purpose bedding is used under storm water drains, explain?
No Answer is Posted For this Question
Be the First to Post Answer
Define What is the difference between routing maintenance and major maintenance in school facilities?
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
what is the method of all soil testing in lab?
is robosand to be use construction ? for slab ?, wall construction and plastering ?,is it give life?,which is best robosand or river sand ?
What is the difference between Wraft and file foundation and where these are used ?
How to deduct block quantity from the slab quantity for concreting for slab.????
Water absorption for stone and first class stone bricks?
brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum
types of piles detail,
0 Answers DLF, IVRCL, JP Group,
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
insted of bentonite we can use any alternate material in piling ?
what is the max spacing of 2 columns upto which there is no need to put beam betwn dem.and how to fix the location of columns and beams in home construction.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)