If Background job active long time ?
Answers were Sorted based on User's Feedback
Answer / adel
First check if SAP was restarted during the time the job was running.
if job shows running while system was restarted it is a bug.
check oss note
otherwise, put some traces on the job. very probably the program has inefficient code doing a very long select. in fact doing nothing.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ramanji
1.Check the over view of the Job-SM37.
2.Check on which workprocess it is running-SM50.
3.Increase the size of TEMP table space.
3.Update the database.
Is This Answer Correct ? | 0 Yes | 0 No |
How to transfer request which is created directly on quality server & has to be moved to in production server?
I have created a role for user. Now i want to unauthorize to user for particular TCODE. Now, what i'll do for this?
how to increase table space in brtools?
why are creating virtual system +sap
Where XML file is generated in solution manager?
while using jspm /sdm the user is locked.what will you do?
are any other tools other than SAP used to manage transport ? if so please provide details .
Why is java Required while installing SAP
What is the difference between installing SAP R/3 and installing a SAP CRM system? OR, what are the installation steps for i) Installing an SAP R/3 and ii) Installing SAP CRM /SAP PLM/SAP business suite?
Basic configuration/ settings after installation of SAP Web AS in standalone SAP-CRM system for web client.
What is difference between oracle 9i and oracle 10g?
what is the difference between se16 and sm30?