Question How to calculate cement and sand quantities in cement mortar
As 1:1,1:2,1:4,1:6 ?
 Question Asked In Companies :: Simplex,     < I also faced this Question! >
 Question Submitted By :: banmayank
  Answer Posted By  
 
Answer
in cement morter the void between sand and cement is less
and take 25% total wet volume of water.take 10 cu m wet
volume of morter increse 25% than total volume of dry
material 12.5 cu m . if we find the material in 1:6 morter
than 12.5/(1+6)
cement=1.78 cu m sand=1.78*6=10.71cu m

Is This Answer Correct ?    11 Yes 17 No


 
  kamlesh patidar
 
View All Answers
 
 
Please Help Members By Posting Answers For Below Questions
 
 Question Views   Select
 
what is grade intersection? 336
suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work. 853
how to manage interview fear? and speak in english? 297
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building 879
all technical question 325
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column 277
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know. 231
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME. 424
WHAT IS THE CALCULATION FOR FINDING CEMENT AND SAND FOR 10' * 12' AREA RATIO 1:6 THICKNESS 12 MM 2070
What is Purpose Of Stirrups give  In Beam ?   809
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis) 308
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site. 218
what is mean by reestimation? 59
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix. 914
What should be the Min.Penetration in a hard rock for all pile diameteres? 249
E-Mail New Answers        Answer Selected Questions