Answer Posted /
Is This Answer Correct ? | Yes | No |
Post New Answer View All Answers
Describe the different types of anesthesia, including general anesthesia, regional anesthesia, and local anesthesia. When and why would you use each type?
What is a database development?
Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance
Is there an easy way to maintain exchange rates in sap?
dear sir i need some information about prevent eutectic carbide network(as cast) formation in 12% cr steel casting by another alloying element(my analays: c=1.2-1.4 cr=11-13 mo=0.2-0.4 ni=0.2-0.4 )or break network carbid after formation in solidification by heat tretment please help me my email adress: alloymail@gmail.com
List commonly used machine learning algorithm?
What is an example of a polysaccharide?
How can I tell if my hard drive is failing?
What is perl scripting?
What are the types of locks in database?
State newton's three laws of motion.
what do u meant by investment banking
Which one is better blue prism or UiPath?
What is the role of WTO in stimulating the Indian economy?
What will you do if a replication thread goes down?